Section 4 done. Formatting fixes

This commit is contained in:
Giulio De Pasquale 2017-01-19 17:30:25 +01:00
parent 0db3108b9f
commit 0bbd835a84

View File

@ -658,6 +658,13 @@ http://www.qsm.com/resources/function-point-languages-table
\end_inset \end_inset
\end_layout
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout \end_layout
\begin_layout Section \begin_layout Section
@ -3532,6 +3539,13 @@ SLOC=46\cdot181=8326
\end_inset \end_inset
\end_layout
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout \end_layout
\begin_layout Section \begin_layout Section
@ -3820,31 +3834,43 @@ Schedule Estimation Now we can estimate the project duration with the following
0.31 ⇠ = 9.44 M onths 0.31 ⇠ = 9.44 M onths
\end_layout \end_layout
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout
\begin_layout Section \begin_layout Section
Tasks & Schedule Tasks scheduling
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
The main tasks of this project are the following: The main assignments of our project are:
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
Creation of the Requirement Analysis and Specification Document [2], which Creation of the Requirement Analysis and Specification Document (
explains in detail functional and nonfunctional require- ments, domain \series bold
assumption and goals of the application to be built. RASD
\series default
).
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
Creation of the Design Document [3], which deals with the architecture and Creation of the Design Document (
the design shape of the application. \series bold
DD
\series default
).
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
Creation of the Integration Testing Plan Document [5], which con- tains Creation of the Integration Testing Plan Document (
integration testing strategy we intend to apply to the application. \series bold
ITPD
\series default
).
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
@ -3852,13 +3878,12 @@ Creation of the Project Plan, this document.
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
Preparation of a quick presentation, using slides, (⇠ 10 min) of the previously Creation of a set of slides to present our work to the client.
mentioned documents to our client.
\end_layout \end_layout
\begin_layout Enumerate \begin_layout Enumerate
Development of the entire application and the preparation of the unit tests. Development of the system and the preparation of the unit tests.
\end_layout \end_layout
@ -3868,23 +3893,46 @@ Running of integration testing on the application.
\end_layout \end_layout
\begin_layout Standard \begin_layout Standard
For the first tasks the activities were already given along with correspond- The first four tasks were already completed within the given submission
ing deadlines for the submission of needed documents. deadlines.
Starting from the im- plementation, instead, no schedule was given so, Starting from step 5 onward, according to our COCOMO® estimation
according to the COCOMO estimation performed and described in 2, we expect \begin_inset Foot
the implementation of the application to be complete in 9.5 months, around status open
the 15th of September 2016.
Regarding the integration testing, it will take place in the last month \begin_layout Plain Layout
of developement. see Section 3 for more details
The development of the application started after the creation of the De- \end_layout
sign Document and will be carried on in parallel with the rest of the tasks.
Tests will be run on the developing application in order to verify the \end_inset
proper functioning of every new functionality added.
In Figure 3 you can find the dependency graph of every task, in Table 20, , we expect to deliver a working implementation within
\series bold
TODO
\series default
months which corresponds to
\series bold
mid-TODO.
\series default
The development started just after the submission of the Design Document
and continued simultaneously with the rest of the tasks; the integration
testing will take place in the last month.
In the meantime, tests will be run all along the entire development process
to verify the proper functioning of every added feature.
\series bold
In Figure 3 you can find the dependency graph of every task, in Table 20,
instead, you can find the schedule of every task. instead, you can find the schedule of every task.
Also the Gantt chart for the project is provided in Figure 4. Also the Gantt chart for the project is provided in Figure 4.
\end_layout \end_layout
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout
\begin_layout Section \begin_layout Section
Resource Allocation Resource Allocation
\end_layout \end_layout
@ -3912,6 +3960,13 @@ This section is meant to show the way our available resources are allocated
24, 25, 26, 27. 24, 25, 26, 27.
\end_layout \end_layout
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout
\begin_layout Section \begin_layout Section
Risks Risks
\end_layout \end_layout
@ -4254,6 +4309,13 @@ How to deal with it: No preventive solutions are available.
\end_layout \end_layout
\end_deeper \end_deeper
\begin_layout Standard
\begin_inset Newpage newpage
\end_inset
\end_layout
\begin_layout Section \begin_layout Section
Appendix Appendix
\end_layout \end_layout